Now it starts to come together. My trusty side kick has sent the drawings for the tub off for lazer cutting. Thanks Tiger8.
Got the bolts and nuts back from plating and some powder coat parts. Still waiting for the frame and subframe.
Seat frame has been refurbished and dropped off for covering
And the trail reducer is on its way. Thanks Humfree
My people in America have recceived the linear actuator and it should be here in Novemeber.
Balls to the wall pappie.
